Architectural drawings being reviewed
Our Process

How a project is executed,
how to end up.

Seven steps, each for which you’ll need to give your approval at the end. Two require the authority’s sign off and building is monitored by the principal throughout construction.

Step by Step

The seven stages

In both design, interior and audit engagements, the sequence is the same, with the engagements being joined at the appropriate point. The durations are subject to change depending on the project and the authority.

Approval authority sign-off required   Audit checkpoint principal inspects and reports
01

Consultation & brief

We call within 24 hours and we are able to arrange a site visit. We will review the scope with you and agree the fee based on that scope.

You receive · Written brief · fee proposal
02

Site study & feasibility

Review the plot to the bye laws and budget to determine what can be constructed and approximate the cost.

You receive · Feasibility note · FAR and setback study
03

Concept design

Specifics of layout and form of interior or building, in plan and 3D views, and revised with you.

You receive · Plans · 3D views · material direction
04

Design development & approvals Approval

The design is clearly presented, the sanction set is submitted and we follow it with authority until it is passed.

You receive · Sanction drawings · approval
05

Working drawings & tender

Structural / services / detail drawings and BOQ for contractors to quote against. We assist you to compare the quotes.

You receive · Working drawing set · BOQ · contractor recommendation
06

Use of a construction with audit checkpoints. Audit checkpoint

The principal visits each stage and compares the bills to the BOQ and sends a written report to you following each visit.

You receive · Stage reports · verified bills · snag lists
07

Handover Audit checkpoint

A final walk through, completion documents and a closing audit report. Available to you after you move in.

You receive · Completion certificate support · final audit report
What You Receive

The result you will have at the end

A cost record

A BOQ was issued before the tender and all the bills were verified against the BOQ, and all the variations agreed to in writing.

Inspection reports

Report with photographs and action list from each site visit, including a date.

An approvals file

Keeping the sanction drawings, approval letters and completion papers in order from the beginning.

Before You Call

What people ask us initially

Quick answers to the most common questions.

The first consultation is free. Once the brief has been quoted, we agree a percentage of project cost or fixed cost per stage before starting design work.

No. We fill out design and BOQ and assist you to solicit and negotiate quotes from contractors.

Design is from 8 to 12 weeks. Depending on the authority, it can take days to get the approvals. We make sure we submit a full file to prevent delays.

Yes. We review them as an audit, point out problems and then either continue the project or support your present team.

You approve at each stage of the process before the next begins. The principal is in charge of the project and will report to you following each site visit.

Residential interior in evening light
Let's Talk

Shall we begin?

Share some details of your plot, home or site. The principal will contact within 24 hours, to schedule a free first consultation.

Speak to the principal architect
Open 24 hours, 7 days a week
Let's Talk

Begin by discussing the project.

Tell us where your plot or space is and what you want. Within 24 hours the principal will call and offer a time to meet or visit the location.

Or call us: +91 98188 86620

Request a Consultation

Fields marked * are required.