Contemporary villa at dusk
Service 01 · Architecture Design

Empty plot
to finishing a building.

We plan houses, offices and institutions, and remain involved in the approval process and construction. The principal selects the project and reviews it on the premises.

Corner perspective render of a four-storey house
Architecture

Concept to
constructionStudio render

What It Is

The one practice that was discussed from feasibility to handover.

You have the plot, the short and the budget. We work out what the bye-laws permit, design the building around your lifestyle and/or work flow, get the sanction and draw the drawings for your contractor to build from. The principal visits at all stages during construction as Auditor.

Who It Is For

Is this the right service for you?

Plot owners

You have a plot and want a house that you can build once around your family that will be approved without the need for repeated rounds.

Businesses

Clinics, offices, showrooms and small commercial buildings that have to operate efficiently and convey the image of a well-run business.

Institutions

Where safety, approvals and long life are as important as appearance, schools and community buildings are considered.

What You Get

Deliverables at each stage

Each stage ends with a set of paperwork and your approval to proceed to the next stage.

01

Consultation & feasibility

We come and check the plot and work out what the bye-laws say.

  • A site visit to the building and survey check.
  • A coverage and setback study is required.
  • Composed Brief and fee offer
02

Concept design

Plans and the outside appearance of the building, changed with you.

  • The layout of the rooms and the cross-sections.
  • 3D views and walkthroughs are now available.
  • Initial material palette
03

Approval drawings

The sanction set is ready, submitted and followed up till it is approved.

  • Sanction drawing set
  • To submit to the authority.
  • Compliance checklist
04

Working drawings

All the costs and materials your contractor quotes and uses for your project.

  • Structural coordination
  • Electrical and plumbing plans, HVAC plans.
  • Details, schedules and BOQ.
05

Construction stage

Site inspections and written reports at each stage, until handover.

  • Stage-wise site audits
  • Bill checks with the BOQ
  • Completion and handover report
Common Questions

Common questions when discussing architecture design:

Quick answers to the most common questions.

Typically, concept and detailed design can take between 8-12 weeks. The duration of the sanctions will vary from country to country. To prevent repeat rounds, we submit a full file.

There is no house style. The design is based on the plot, climate and your brief, whether it is contemporary or classical.

The fees are based on construction cost or a fixed fee for each phase and agreed in writing prior to beginning design.

Yes, throughout Northern India. Travel and frequency of visits to the site are discussed at initial consultation.

Residential interior in evening light
Let's Talk

Planning to build? Start here.

Share some details of your plot, home or site. The principal will contact within 24 hours, to schedule a free first consultation.

Speak to the principal architect
Open 24 hours, 7 days a week
Let's Talk

Begin by discussing the project.

Tell us where your plot or space is and what you want. Within 24 hours the principal will call and offer a time to meet or visit the location.

Or call us: +91 98188 86620

Request a Consultation

Fields marked * are required.